The setup time was reduced
faster strength verification vs. manual calculations
Weight reduced by up to 25 kg/m², making it lighter than conventional solutions
Time saved on report generation
Faster buckling checks
Reduction in total project time
Reduction of model analysis time
Savings on labor costs
pages of reporting auto-generated with SDC Verifier
days to process yield and buckling checks across 22 FEM models
load combinations for ULS, blast, heel & fatigue